AC Chiller Optimization - Part 7 of 7 Part Series

Keith McAslan is a Managing Partner with ASG Energy a comprehensive solutions provider for energy savings using LED lighting, HVAC Optimization,  Solar Power and Energy Storage.  For additional information, please visit:  www.asgenergyllc.com or email at info@asgenergyllc.com.

Posted on Friday 15th March 2019

Implementation Approach

What is the typical implementation process?

The typical implementation process is summarized below:

ECORE Implementation Process

We will provide the customer with a simple data sheet (level 1 Data Sheet). After the customer completes the Level 1 Data Sheet, we will develop a preliminary estimate of the potential energy and cost savings. If the savings are sufficiently large, we will request permission from the customer to conduct a detailed investment grade audit (IGA) at our cost.

Upon completion of the IGA, we will submit a detailed business proposal specifying the savings estimate, guarantee, pricing and payment options.

Upon approval of the proposal and section of the pricing model, we will complete the customization of the ECORE algorithm, modification of the program and manufacturing of the panel, installation and commissioning, and verification of the savings.

How long does this take?

Typically, the process of customization, manufacturing, installation and commissioning takes about 6 to 8 weeks.

What is involved in installation and commissioning?

The ECORE panel is shipped to the customer site and installed in the chiller control room. We need to spend a few days in commissioning, which involves assuring that all of the connections ate operating correctly, data is being read correctly by our algorithm, and the control signals are being transmitted appropriately.  This process can also be done remotely if we have internet access.

The installation and commissioning do not disrupt any operations.

How are the savings verified?

We use the procedures and guidelines of the International Performance Measurement and Verification Protocol (IPMVP) that was developed in the U.S. and is used in over 30 countries. The measurement and verification approach will be specified and mutually agreed upon.

 

About ASG Energy LLC

ASG Energy LLC is a comprehensive LED energy solutions provider, with a successful track record of managing energy reduction initiatives and installations for several Fortune 500 companies, schools and health care facilities throughout the U.S.  ASG Energy’s reach extends nationally to serve its customers.  For more information visit -  http://asgenergyllc.com/ecore/

About Revolution Energy Group

Revolution Energy Group was established to provide next generation commercial energy efficiency solutions.  Revolution supports public and private sector facility owners and managers who seek high ROI “Energy Intelligence” to reduce operating costs and meet sustainability goals. For more information please visit www.revolutionenergygroup.com. See this link for the optimization beyond HVAC Optimization.

test image for this block